Oracle AIM ( Oracle application implementation methodology )

Oracle AIM ( Oracle application implementation methodology )
Application Implementation Methodology has laid out various stages available in a project.
Stage 1 - Definition of Project Management
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Description
========
The success to any project is a well thought of PROJECT PLAN at the very beginning
considering the requirements and available resources. A Normal Contention of many people is
that Project Plan should normally stage the Start Date and End Date and the Consideration, but
in real time it is actually many more that, the whole project is broken in to different phases and
for each phase a detailed plan is laid out which in turns account for the overall project plan.
Project Plan must be revised whenever there is a Change in the contract or requirement of the
client
Documentation to be Prepared
======================
Project Plan (Finalized or Draft)
Write up about the Client and the Consultant.
Stage 2 - Operational Analysis
~~~~~~~~~~~~~~~~~~~~~~
Description
========
This is the very Critical stage of the Project. One must devote the maximum possible time to this
stage. Any compromise on this stage may prove critical at later stage of the project. In this stage
a Consultant, who is a total stranger to the client so far is going to make an effort to become an
expert in understanding the client business every inch. Only when he masters the
clients business, he will be in a position to think beyond it and provide solutions considering the
impact it can have on overall business. In this stage a consultant must carryout following
activities:
-- Clearly understand the contractual obligations made between the client and the consultant
with respect to the work to be performed.
-- Detailed study on the Client business and Organization Structure
- Capture the current business process as they are following ( Also known as AS IS
documentation)
- Collect the requirements from the client, managers, end users as to what they expect from the
Oracle Product
-- Requirements with respect to Functional Side as well as Technical Side is collected
-- Document the bottlenecks faced with the existing system in place
-- Most important point is that get the document signed from the client
( Note: Normally speaking once a requirement is expressed at this stage , it will be taken care by
the consultant, however in real time, requirements gathering becomes a day to day activity in
many clients place, which is highly unprofessional way of working )
Documentation to be Prepared
======================
RD 10 --> Current Financial and Operating Structure
RD 20 --> Current Business Baseline
RD 50 --> Business Requirements Gathering

Stage 3 - Solution Design
~~~~~~~~~~~~~~~~~~~
Description
========
After making serious understanding and analysis on clients current business practices and future
requirements, consultant must begin the process of providing solutions to each and every aspect.
If an straight forward solution is not possible , think about the possibility of workaround. Enough
analysis has to be one in drafting the new business process of the client which is going to be
followed here after, it is also known as To Be Process. Once the solution is decided on, the same
must be communicated to the client seeking acceptance. when the client is satisfied with the
solution, consultant can put an end to his research work on providing alternate solutions.
Documentation to be Prepared
======================
BP 80 --> Business Process Design ( To be process )
BR 10 --> High Level Gap Analysis
BR 30 --> Business Requirements Mapping
MD 50 --> Application Extension Functional Design
MD 70 --> Application Extension Technical Design

Stage 4 - Building Stage
~~~~~~~~~~~~~~~~~~

Description
========
Only at this stage the work of performing setups and access to the instance begins. Based on the
Solutions and new business process ( To Be) designed at the previous stage, the consultant starts
performing setting up of the Application. In case of a functional requirement, it will be setups
from the front end, in case of technical requirements, SQL scripts, customizations will be
performed. Document all the setups that has been carried out at this stage, since it will be useful
when the production Instance is configured or when there is a system crash or corruption of data
or any hardware failure. After performing all required setups, the system has to be tested for its
readiness to carry out operations
Documentation to be Prepared
======================
BR 100 --> Application Setup
BR110 --> Security Profiles
TE 20 --> Unit Test Script
TE 40 --> System Test Script
TE 50 --> System Integration Test Script
TE 120 --> System Integration Test Plan

Stage 5 - Transition Stage
~~~~~~~~~~~~~~~~~~
Description
========
In this stage, client is exposed to the Applications for the first time to get the comfort level. In
order to make the client to get a feel of the system, user guides, training manuals and training
may be given in understanding how their business is completely taken care by the product. Once
the client is exposed to the Applications, they normally tend to show some interest in learning
new things, which can be used for testing the system. Once the client is satisfied with the
Solutions and the way in which the system performs, he can express his wildlings to accept the
system. In real time, acceptance will be taken up at two levels,
First Level - CRP - Conference Room Piloting - Where the consultant gives a preview of the new
system to the selected members of the client and get their feedback.
Second Level - UAT - User Acceptance Testing - Here the consultant gives detailed
demonstration on the new system to the users ( Super and End ), and get the acceptance from the
users that the new system meet their expectations.
Documentation to be Prepared
======================
TE 130 - User Acceptance Test Report

Stage 6 - Production Stage
~~~~~~~~~~~~~~~~~~
Description
========
Once CRP and UAT is approved, it is the duty of the consultant to replicate the same in a new
environment which will be used solely and exclusively for the Production purposes only. After
making the production server ready with all setups, it is advised to clone the production server to
an development or test server, so that any value addition or future testing can be carried out
separately in future. Once the production server is ready, it is given to the client to begin their
operations, which is termed as GO LIVE . In order to assist the client in adopting to the new
system, consultant will provide them with User Manuals and also a support consultant for a
short period of time if needed.
Once the production server is ready and used, the implementation gets over, and the client
should give it in writing that he is satisfied with the implementation taken place, which is termed
as sign off
Documentation to be Prepared
======================
DO 070 --> User Manuals
Client's sign off on the Acceptance Certificate

Oracle AIM Documents list (Oracle Application Implementation Methodology)


1. Business Process Architecture (BP)
BP.010 Define Business and Process Strategy
BP.020 Catalog and Analyze Potential Changes
BP.030 Determine Data Gathering Requirements
BP.040 Develop Current Process Model
BP.050 Review Leading Practices
BP.060 Develop High-Level Process Vision
BP.070 Develop High-Level Process Design
BP.080 Develop Future Process Model
BP.090 Document Business Procedure
2. Business Requirements Definition (RD)
RD.010 Identify Current Financial and Operating Structure
RD.020 Conduct Current Business Baseline
RD.030 Establish Process and Mapping Summary
RD.040 Gather Business Volumes and Metrics
RD.050 Gather Business Requirements
RD.060 Determine Audit and Control Requirements
RD.070 Identify Business Availability Requirements
RD.080 Identify Reporting and Information Access Requirements
3. Business Requirements Mapping
BR.010 Analyze High-Level Gaps
BR.020 Prepare mapping environment
BR.030 Map Business requirements
BR.040 Map Business Data
BR.050 Conduct Integration Fit Analysis
BR.060 Create Information Model
BR.070 Create Reporting Fit Analysis
BR.080 Test Business Solutions
BR.090 Confirm Integrated Business Solutions
BR.100 Define Applications Setup
BR.110 Define security Profiles
4. Application and Technical Architecture (TA)
TA.010 Define Architecture Requirements and Strategy
TA.020 Identify Current Technical Architecture
TA.030 Develop Preliminary Conceptual Architecture
TA.040 Define Application Architecture
TA.050 Define System Availability Strategy
TA.060 Define Reporting and Information Access Strategy
TA.070 Revise Conceptual Architecture
TA.080 Define Application Security Architecture
TA.090 Define Application and Database Server Architecture
TA.100 Define and Propose Architecture Subsystems
TA.110 Define System Capacity Plan
TA.120 Define Platform and Network Architecture
TA.130 Define Application Deployment Plan
TA.140 Assess Performance Risks
TA.150 Define System Management Procedures
5. Module Design and Build (MD)
MD.010 Define Application Extension Strategy
MD.020 Define and estimate application extensions
MD.030 Define design standards
MD.040 Define Build Standards
MD.050 Create Application extensions functional design
MD.060 Design Database extensions
MD.070 Create Application extensions technical design
MD.080 Review functional and Technical designs
MD.090 Prepare Development environment
MD.100 Create Database extensions
MD.110 Create Application extension modules
MD.120 Create Installation routines
6. Data Conversion (CV)
CV.010 Define data conversion requirements and strategy
CV.020 Define Conversion standards
CV.030 Prepare conversion environment
CV.040 Perform conversion data mapping
CV.050 Define manual conversion procedures
CV.060 Design conversion programs
CV.070 Prepare conversion test plans
CV.080 Develop conversion programs
CV.090 Perform conversion unit tests
CV.100 Perform conversion business objects
CV.110 Perform conversion validation tests
CV.120 Install conversion programs
CV.130 Convert and verify data
7. Documentation (DO)
DO.010 Define documentation requirements and strategy
DO.020 Define Documentation standards and procedures
DO.030 Prepare glossary
DO.040 Prepare documentation environment
DO.050 Produce documentation prototypes and templates
DO.060 Publish user reference manual
DO.070 Publish user guide
DO.080 Publish technical reference manual
DO.090 Publish system management guide
8. Business System Testing (TE)
TE.010 Define testing requirements and strategy
TE.020 Develop unit test script
TE.030 Develop link test script
TE.040 Develop system test script
TE.050 Develop systems integration test script
TE.060 Prepare testing environments
TE.070 Perform unit test
TE.080 Perform link test
TE.090 perform installation test
TE.100 Prepare key users for testing
TE.110 Perform system test
TE.120 Perform systems integration test
TE.130 Perform Acceptance test
9. PERFORMACE TESTING (PT)
PT.010 - Define Performance Testing Strategy
PT.020 - Identify Performance Test Scenarios
PT.030 - Identify Performance Test Transaction
PT.040 - Create Performance Test Scripts
PT.050 - Design Performance Test Transaction Programs
PT.060 - Design Performance Test Data
PT.070 - Design Test Database Load Programs
PT.080 - Create Performance Test TransactionPrograms
PT.090 - Create Test Database Load Programs
PT.100 - Construct Performance Test Database
PT.110 - Prepare Performance Test Environment
PT.120 - Execute Performance Test
10. Adoption and Learning (AP)
AP.010 - Define Executive Project Strategy
AP.020 - Conduct Initial Project Team Orientation
AP.030 - Develop Project Team Learning Plan
AP.040 - Prepare Project Team Learning Environment
AP.050 - Conduct Project Team Learning Events
AP.060 - Develop Business Unit Managers’Readiness Plan
AP.070 - Develop Project Readiness Roadmap
AP.080 - Develop and Execute CommunicationCampaign
AP.090 - Develop Managers’ Readiness Plan
AP.100 - Identify Business Process Impact onOrganization
AP.110 - Align Human Performance SupportSystems
AP.120 - Align Information Technology Groups
AP.130 - Conduct User Learning Needs Analysis
AP.140 - Develop User Learning Plan
AP.150 - Develop User Learningware
AP.160 - Prepare User Learning Environment
AP.170 - Conduct User Learning Events
AP.180 - Conduct Effectiveness Assessment
11. Production Migration (PM)
PM.010 - Define Transition Strategy
PM.020 - Design Production Support Infrastructure
PM.030 - Develop Transition and Contingency Plan
PM.040 - Prepare Production Environment
PM.050 - Set Up Applications
PM.060 - Implement Production Support Infrastructure
PM.070 - Verify Production Readiness
PM.080 - Begin Production
PM.090 - Measure System Performance
PM.100 - Maintain System
PM.110 - Refine Production System
PM.120 - Decommission Former Systems
PM.130 - Propose Future Business Direction
PM.140 - Propose Future Technical Direction